Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 08/12/22 in all areas

  1. See the below points for clarification on recent airspace changes. A Class D Tower that does NOT provide a procedural approach service, does NOT require a procedural tower endorsement. A Class D Tower (Procedural Tower) that DOES provide a procedural approach service, requires a procedural tower endorsement. Extending approach/departure (TCU) services: A controller may provide control services as HB_APP from LT_APP, and vice versa, by assuming the sectors and activating the applicable frequency in the VSCS. A controller may provide control services as MK_APP from RK_APP, and vice versa, by assuming the sectors and activating the applicable frequency in the VSCS. If in either of the above scenarios, the other TCU position is filled by another controller, the controller providing an extended services shall relinquish the applicable airspace to the new controller, in the same way as Enroute controllers would do. For further clarification, CG_APP is included in the default jurisdiction of Brisbane Approach (is a sub-sector of BN_APP) and therefore not considered as providing extended coverage. Refer to the NOTAM regarding opening of non-standard/child positions.
    1 point
×
×
  • Create New...